City of Los Angeles · Mulholland Specific Plan
Slope Band Analysis Form
CP-7848 / CP-7851 · LAMC §12.21 C.10
Definition
The Slope Band Analysis is a Baseline Hillside Ordinance instrument required by the Mulholland Specific Plan packet. It allocates the lot to slope bands (0–15%, 15–30%, 30–45%, 45–60%, 60%+) and calculates the Residential Floor Area (RFA) eligibility under LAMC §12.21 C.10. The form (CP-7848) and exhibit (CP-7851) must be prepared, stamped, and signed by a State of California registered Civil Engineer or Licensed Land Surveyor, and verified by City Planning staff before submission to Zoning Plan Check.
Why It Matters for Mulholland
The BHO RFA cap is independent of the Specific Plan’s height bands and grading caps. A project may comply with all Mulholland provisions and still exceed BHO RFA. The Slope Band Analysis is the determinant. Specific Plan compliance does not waive BHO compliance — both apply.
What the Analysis Determines
- The lot’s allocation across slope bands (0–15, 15–30, 30–45, 45–60, 60+ percent).
- The base Residential Floor Area under LAMC §12.21 C.10, by applying the per-band area factors to lot area.
- Hillside Construction Regulations applicability based on the slope distribution.
- Average Natural Slope, calculated by formula: S = (I × C) / A × 100, where I is the contour interval, C is the total length of all contour lines, and A is the lot area in square feet.
What Plan Check Looks For
- The CP-7848 form prepared, stamped, and signed by a registered Civil Engineer or Licensed Land Surveyor.
- The CP-7851 exhibit (Slope Band Analysis Worksheet) consistent with the topographic survey.
- City Planning staff verification of the form before submission to Zoning Plan Check.
- The BOE Hillside Referral Form for streets and sewers, completed by the Department of Public Works.
- Average Natural Slope calculation matching the topographic survey.
- RFA calculation consistent with the proposed building floor area shown on the architectural set.
Upstream Decisions
- Engage the Civil Engineer or Land Surveyor early. The Slope Band Analysis cannot be back-derived from architectural drawings — it must come from a stamped survey.
- Run the BHO RFA calculation in parallel with the Specific Plan height/grading analysis. A project that maxes the Specific Plan but fails BHO is still non-compliant.
- Coordinate the Hillside Referral Form for streets and sewers with the project’s Civil Engineering scope. BOE review is a separate gate.
- Confirm Hillside Construction Regulations applicability before locking the building footprint and parking layout.
The proposed building totals 4,800 square feet. The project complies with the Specific Plan (height under the 30-foot upslope cap; grading under the 1:4 ratio), but exceeds BHO RFA by 600 square feet. The applicant either redesigns to fit the BHO cap or pursues an Adjustment under the BHO process — independent of any Specific Plan relief.
Source: City of Los Angeles Department of City Planning, Slope Band Analysis Form (CP-7848) and Slope Band Analysis Exhibit A (CP-7851). Underlying RFA framework at LAMC §12.21 C.10 (Baseline Hillside Ordinance). Required by Mulholland Specific Plan Project Compliance Filing Instructions (CP13-3618).
Working on a property in the Mulholland Specific Plan area?
Design 1 Studio reviews zoning, slope, visibility, grading, and plan check constraints before drawings move too far in the wrong direction.
Building design firm based in Pasadena, California. Over a decade serving Los Angeles County with residential and commercial design, including ADUs, hillside projects, multifamily, and historic-district work. Inspector-led methodology focused on producing drawings that anticipate plan check rather than react to it. Specialty work in Mulholland Specific Plan navigation. Contact through design1.studio.