SB 9 Design in Los Angeles County
Services / SB 9 Design
Scroll
Two homes on one lot, by right
SB 9 lets the owner of a single-family lot in California add a second primary dwelling, and in many cases split the lot in two, through ministerial review: no hearing and no discretionary findings. It has two separate parts. A two-unit development under Government Code section 65852.21 adds a second home on the existing lot. An urban lot split under section 66411.7 divides the lot, with up to two units on each half. The first does not depend on the second. An owner can keep the lot whole and build the second home.
Design 1 Studio has designed more than 1,500 projects across Los Angeles County and Orange County since 2015, and SB 9 work has been part of that since the law took effect in January 2022. Our work is residential, up to four units and two stories.
Planning more than two units? See duplexes, triplexes and fourplexes.
Not sure what the lot allows? Start with a feasibility review.
What a city can require, and what it cannot
Cities apply their objective standards to SB 9 projects: height, setbacks, floor area, parking and design rules written as numbers. The statute caps side and rear setbacks at four feet and requires no setback for an existing structure that stays in place. SB 9 itself bars any objective standard that would physically keep an owner from building two units, or keep either unit under 800 square feet (Government Code 65852.21(b)(2)(B)). Senate Bill 450, in effect since January 1, 2025, added two more limits: a city may not apply standards to an SB 9 project that it does not apply to other housing in the same zone, and it must decide within 60 days of a complete application. The charter cities’ lawsuit over SB 9 is back in the trial court after the Court of Appeal set aside the ruling against the law in November 2025, and we check the current status before relying on SB 9 in a charter city.
What a city cannot do is review an SB 9 application as something it is not.
Two SB 9 paths, and what each one gets you
Two-unit development, no lot split. Two homes on the existing lot, approved by the building department as a ministerial permit. In the City of Los Angeles that application goes to LADBS. ADUs can usually be added on top, subject to the city’s ADU rules, which is how a single-family lot reaches four units without a subdivision.
Urban lot split. The lot is divided into two roughly equal lots, each with up to two units. In the City of Los Angeles the split is a City Planning application, separate from the building permits for the units. After a split, the city may cap each new lot at two units including ADUs, the owner must sign an affidavit to live on one of the lots for three years, and the lot cannot have been split under SB 9 before.
Which one. Owners who want to keep one parcel and add rental units take the first path. Owners who want to sell one half, or finance each half on its own, take the split. We run both on paper before recommending one, with the unit count, the setbacks and the ADU rules each path allows.
The Walnut reading, reversed
In July 2025, Walnut planning staff wrote that because the owner was not pursuing a lot split, the property was “only eligible for ADUs/JADUs” and “the opportunity for two primary dwellings is not permissible,” after discussion with the City Attorney. We answered in writing: a two-unit development under section 65852.21(a) does not depend on a lot split, and a primary dwelling under that section is not an ADU. We supplied the statute language and HCD’s SB 9 fact sheet on primary units on a lot that has not been split, and asked the city to evaluate the proposal under the route the statute describes. Later that month the planner wrote that the owner could proceed under SB 9, the first project of its kind in the city. The full record is in our case studies.
How we design an SB 9 project
- The lot read comes first: zone, overlays, historic status, fire hazard zone, easements, and the lot’s permit history. SB 9 excludes some lots, among them historic districts and landmarks, certain hazard zones, and housing a tenant has occupied in the last three years, so eligibility is settled before anything is drawn.
- The unit strategy follows the lot and the owner’s goal: two primary units on the whole lot, a lot split with up to two on each side, or either of those with an ADU where the city’s combination rules allow it.
- The city’s SB 9 ordinance is checked line by line against the statute, and every departure is answered with the section that controls before the plans go in.
- A complete plan set coordinated with a licensed structural engineer, managed through plan check to permit issuance. When a city issues a correction the statute does not support, we answer it in writing.
FAQ
Do I have to split my lot to use SB 9?
No. A two-unit development under section 65852.21 stands on its own. The urban lot split under section 66411.7 is a second, separate tool.
Can my city deny an SB 9 project?
Only on the narrow grounds the statute sets: an ineligible lot, or a written finding by the building official, based on a preponderance of the evidence, that the project would have a specific, adverse impact on public health and safety with no feasible way to mitigate it. Design preferences are not grounds.
Does SB 9 apply in charter cities?
The statute says it does, as a matter of statewide concern, and SB 450 restated that finding in 2024. Redondo Beach, Carson, Torrance and Whittier sued. The trial court ruled for the cities in April 2024. The Court of Appeal reversed that ruling in November 2025 and sent the case back to be reconsidered in light of SB 450. As of October 2026 the case is back in the Los Angeles Superior Court, the judgment against SB 9 is set aside, and SB 9 applies in charter cities while the case continues. We check the status before relying on SB 9 in a charter city.
Can I add an ADU as well?
Often, within limits that depend on whether the lot was split and how the city applies the combination rules. That unit count is settled in the lot read, because it is where SB 9 projects most often go wrong.
How we work
A flat fee for the scope, quoted in writing before we start. No hourly surprises.
Plan check corrections are handled through permit issuance as part of that fee.
We draw the plans. We do not build. You own the approved set, and any licensed contractor can bid it.
Every set is coordinated with a licensed structural engineer, and the plans carry our name through the City’s review.
The city has 60 days from a complete application to decide.
Start Your SB 9 Project
Send the address and what you want to build. We read the lot and the city’s ordinance and tell you in writing which route the statute gives you.
Pasadena · Arcadia · Glendale · Long Beach · and 80+ more cities
Weekends by appointment
