Skip to content

Before You Buy: A Property Checklist for an ADU, Addition or Rebuild

Library / Before You Buy

Scroll

Buying a property because of what you plan to build on it? This free worksheet lists 23 questions to get answered before your decision is due. It doesn’t tell you what a property allows. It tells you what to ask, and who can confirm each answer.

Fillable PDF, three pages. No email needed.

For agents: Share this sheet while your buyer still has time to request records and review the answers.

What it covers

  • Your plan and the paper trail. What the purchase depends on, who regulates the parcel, what the permit records show, any city report at sale, garage and parking, open permits, rental use, and plans that come with the sale.
  • Rules that limit the project. Zoning and special areas, recorded restrictions, the existing building against today’s rules, the size the lot still allows, what the project’s size triggers, and rebuilds.
  • What fits on the lot. Boundaries, easements and utility access, room for the project, mapped hazards, drainage and trees, sewer or septic, water service and fire access.

Why these questions

Local rules differ more than most buyers expect. A few examples:

  • Reports at sale. In the City of Los Angeles, the owner has to get a City report on a residential property before selling it. The report shows the use that the building permits and certificates of occupancy on record authorize (LAMC 96.302 and 96.304). Pasadena requires a presale certificate every time a house, condominium, townhouse or duplex is sold (PMC 14.17.030). Culver City requires a City property report showing the authorized use, occupancy and zoning before the owner enters into a sale agreement (CCMC 15.08.015).
  • Older buildings. Under Monrovia’s repair rule for nonconforming structures, the work in any 12 months can’t exceed 10 percent of the replacement cost of the whole structure (MMC 17.48.040).
  • Sprinklers. In Culver City, adding a story to a house, or increasing its enclosed floor area by more than 75 percent, means fire sprinklers in the old and new parts of the building (CCMC 9.02.040). Under state law, building an ADU doesn’t trigger sprinklers in the existing main house (Government Code 66314(d)(12)).
  • Septic. In unincorporated Los Angeles County, Public Health won’t permit a new septic system, or approve the repair or replacement of one, when a public sewer is available within 200 feet of the building (County Code 11.38.730).
  • Rental income. In Los Angeles, an ADU whose building permit application was filed on or after January 1, 2017 can’t be used for home-sharing unless it is the host’s primary residence (LAMC 12.22 A.32(d)(4)).

Rules differ by city and they change. Confirm each one with the city or county for your parcel.

How to use it

  1. Start with row 1. Write down what the purchase depends on, and where each assumption came from.
  2. For each row, fill in what you know, what is still unknown, and who will verify it.
  3. Ask the seller and your agent for records early. Archived permit files can take time to arrive.
  4. Take the unknowns to the people who can answer them: the planning or building counter, the title company, a surveyor, the utility.
  5. Make your decision with the remaining unknowns in view.

When you want the unknowns answered

A feasibility review checks the available records for one property and identifies which questions need an agency or a specialist. Call (626) 214-8651. Serving Los Angeles County and Orange County.

FAQ

Is the checklist free?

Yes. It’s a free PDF, and you don’t need to give an email address.

Does the checklist tell me whether I can build an ADU?

No. It lists the questions to ask and who can confirm each answer. What a property allows depends on its zoning, its permit records and the lot itself.

When should I use it?

Before your decision is due, while you still have time to request records and review the answers.

Who answers the questions?

The city or county planning and building counters, the title company, a surveyor, the utilities, the HOA and, for soils, a geotechnical engineer. A feasibility review can check the available records and tell you which questions need an agency or a specialist.