Pre-Approved ADU Plans in Los Angeles County
Services / Pre-Approved ADU Plans
Scroll
What a pre-approved plan is, and is not
Three programs in Los Angeles County offer ADU plans that have been reviewed before you file: Los Angeles County’s Pre-Approved ADU Standard Plans Program for unincorporated areas, run by Public Works; the City of Los Angeles’s ADU Standard Plan Program, run by LADBS, for lots inside city limits; and the San Gabriel Valley Council of Governments’ Pre-Approved ADU Plans Program, a set of pre-reviewed plans owned by their designers and offered to its member cities. The County and LADBS plans have cleared the building and structural portion of plan check in their own jurisdictions. The SGVCOG plans were reviewed through that program, and each member city decides what the review counts for. A pre-approved plan saves the cost and time of designing the building and, where the jurisdiction honors it, clearing the building portion of plan check. It does not approve the building on your lot. What is pre-done is the structure. What is left is everything about where it sits.
What the stamped plan still needs
- A site plan: the unit placed on the lot with setbacks, separation from the house, access, drainage and the easement check.
- Zoning review: the zone, overlays, hillside and fire hazard designations, historic status, and the city’s own ADU ordinance.
- Foundation and soils: the standard plan’s foundation assumes level ground and ordinary soil. A sloped or expansive lot needs a site-specific foundation sheet from a licensed engineer.
- Utilities: water, sewer or septic, electrical service size, gas, and fire sprinklers where the main house has them.
- Energy and fire: the energy documents for the orientation chosen, and fire-rated construction where the unit sits near a property line.
- The submittal itself: the application, the plan check that remains, and the corrections that come back, which are about the lot, not the building.
The question nobody asks until plan check
A plan is pre-approved only where the jurisdiction says so. The County’s plans are for unincorporated County land. LADBS’s are for the City of Los Angeles. The SGVCOG plans are offered to its member cities, which decide how to treat them; Monrovia was one of the ten cities that helped select the designs. In any other jurisdiction the same plan is a regular submittal. Every city and county was required to have a pre-approved plan program by January 1, 2025, but a plan is pre-approved only where that city’s program accepts it. Before buying a plan, confirm which jurisdiction the lot is in and what it will honor, because that answer decides whether the plan buys you anything.
How we work with a pre-approved plan
- We confirm the jurisdiction and the program, then read the lot: zone, overlays, setbacks, slope, utilities, the garage and any existing structures.
- We choose the plan and orientation that fit, or tell you plainly that the lot needs a custom unit, before any money goes to a plan.
- We prepare the site plan, the zoning sheet, the utility plan and any site-specific foundation sheet, coordinated with a licensed structural engineer.
- We submit and manage the plan check to issuance. Since January 1, 2026, the city has 15 business days to tell you in writing whether an ADU application is complete; it then has 30 days from a complete application to decide, the shorter deadline AB 1332 set for pre-approved plans. Any other ADU application gets 60 days.
Our own standard plan: 749 square feet, two bedrooms, two baths
Besides the County and city programs above, we have a standard detached ADU plan of our own: 749 square feet, two bedrooms and two bathrooms, already drawn and engineered. We fit it to your lot, add the site plan and any sheets your city requires, and take it through plan check to the permit for one flat fee, quoted in writing. It is not a city pre-approved plan, so it goes through your city’s normal review; what it saves is the design stage, because the layout and the engineering are already done.
We share the full plan when we talk about your lot. Ask about the standard plan
FAQ
Does a pre-approved plan skip plan check?
No. A County or LADBS plan skips the building review of the structure in its own jurisdiction; an SGVCOG plan skips whatever the member city has agreed to honor. The site plan, zoning, foundation and utilities are reviewed for your lot like any other application.
Can I use a County pre-approved plan in Pasadena or Monrovia?
Not as a pre-approved plan. A County or LADBS approval is good only in the jurisdiction that issued it, and an SGVCOG plan counts only for what the member city honors. In another city the same set is submitted as a regular plan set.
Can a pre-approved plan go on a sloped lot?
Usually, with a site-specific foundation design. The standard foundation assumes level ground and ordinary soil.
Is a garage conversion a pre-approved plan?
No. Pre-approved plans are new detached units. A conversion is designed around the structure you already have.
How we work
A flat fee for the scope, quoted in writing before we start. No hourly surprises.
Plan check corrections are handled through permit issuance as part of that fee.
We draw the plans. We do not build. You own the approved set, and any licensed contractor can bid it.
Every set is coordinated with a licensed structural engineer, and the plans carry our name through the City’s review.
The city has 30 days from a complete application on a plan it has pre-approved.
Check Your Lot First.
Send the address and the plan you are looking at. We tell you whether it works on your lot before you buy it.