ADU Design and Building Plans in Rosemead
In Rosemead, the Planning Division sees an ADU before the building department does. Every ADU goes through an administrative site plan and design review first, then building plan check. Knowing which review your project needs, and drawing the set for it, is most of the schedule here.
What we watch for in Rosemead
- Planning review comes first. The City requires an administrative site plan and design review by the Planning Division before an ADU goes into building plan check. We submit the planning set complete, so the second step isn’t waiting on the first.
- The 2,500 square foot line. For new homes and additions in Rosemead’s residential zones, design review is administrative below 2,500 square feet of total developed living area. At 2,500 or more, it requires a discretionary site plan and design review by the Planning Commission. On an addition near that line, we show the owner both versions on paper.
- Long second-floor walls. Rosemead’s residential standards require any second floor exterior side wall that exceeds a length of 24 feet to have an offset of two feet for a distance of not less than eight feet. We draw the massing to meet the criteria the first time.
- A 2020 ADU ordinance and newer state law. The City’s ADU rules were last rewritten in 2020 (Ordinance 995). State ADU law has changed every year since. Where they differ, state law controls, and we design to it.
How review works in Rosemead
Rosemead reviews ADUs and additions through its Planning Division and its Building and Safety Division. Completed application forms are submitted to the Building and Safety Division. Before building plan check, an ADU needs an administrative site plan and design review from the Planning Division. State law gives the City 60 days from a complete application to decide on an ADU, and 30 days on a pre-approved plan. We submit to Rosemead the same way we submit everywhere: a complete set, the corrections answered in writing, and the permit carried through issuance.
Rosemead ADU rules, in plain terms
- Where the rules live: Rosemead Municipal Code Section 17.30.190, as rewritten by Ordinance 995 (effective October 8, 2020).
- Process: administrative site plan and design review by Planning, then building plan check. No public hearing for an ADU.
- What state law guarantees on any Rosemead lot with a home:
- an ADU of at least 800 square feet;
- 16 feet tall;
- 4-foot side and rear setbacks;
- a decision within 60 days of a complete application;
- no replacement parking when a garage is converted.
- From January 1, 2027: state law (AB 956) requires Rosemead to approve two new detached ADUs of up to 800 square feet each, with 4-foot side and rear setbacks, on a lot with a single-family home. Where the City’s code allows fewer, state law controls. What changes in 2027
Our work in Rosemead
- A two-story addition beside an old setback. In 2019 we designed a 716-square-foot, two-floor addition to an 890-square-foot home whose side wall sat 2 feet 10 inches from the property line. We prepared the minor exception request for that existing setback and revised the drawings through review. We also coordinated the school fee and the owner-builder forms the City needed to issue the permit. The owner received the approved plans in May 2020.
Rosemead questions
Does an ADU in Rosemead need design review?
Yes, at staff level. The City requires an administrative site plan and design review by the Planning Division before building plan check. There’s no public hearing for an ADU.
When does an addition in Rosemead go to the Planning Commission?
When the new home or addition reaches 2,500 square feet of total developed living area. Below that, design review is administrative.
Which ADU rules apply in Rosemead?
The City’s ordinance, last rewritten in 2020, and state ADU law, which has changed several times since. Where they conflict, state law controls.
Last reviewed: November 2026
Read the code
- Rosemead Municipal Code Section 17.30.190, Accessory dwelling units
- Rosemead Municipal Code Section 17.12.030 and Section 17.136.030 (residential design review thresholds)
- City of Rosemead, Accessory Dwelling Units page
- California Government Code 66314 to 66342
Our Services in Rosemead
ADU Design
Detached ADUs, garage conversions, junior ADUs, and two-story units. Permit-ready plans prepared for Rosemead’s specific requirements.
Custom Home Design
Ground-up residential design from modern to traditional. Complete plan sets prepared for permitting.
Additions & Remodels
Room additions, second stories, kitchen and bath redesigns, whole-home renovations. Seamless integration with existing structures.
Plan Check Corrections
Plans stuck in review? We take over stalled projects, resolve code issues, and get permits approved.
Legalize Unpermitted Work
As-built documentation, code compliance analysis, and permit legalization for existing unpermitted additions and conversions.
Duplexes, Triplexes & Fourplexes
Duplexes, triplexes, and fourplexes, up to four units and two stories. Density analysis and code-compliant design.
Start Your Rosemead Project
Free consultation. We’ll review your project and the permit path, then quote a flat fee in writing. No pressure, no obligation.