ADU Design and Building Plans in Pasadena
Pasadena writes some of the most detailed ADU rules in Los Angeles County. On most lots, a new detached ADU can reach 1,200 square feet. In the Hillside Overlay the cap is lower, and on a narrow hillside street it’s lower again. In landmark and historic districts, what the street can see matters. And in 2025 the State asked the City to fix six parts of its ADU ordinance. A Pasadena ADU starts with knowing which of those rules your lot falls under.
What we watch for in Pasadena
- The Hillside Overlay and the street in front. In a Hillside Overlay District, a new detached ADU is limited to 1,000 square feet and 16 feet tall. If the hillside lot is served by a street 26 feet wide or narrower, a new attached or detached ADU is limited to 800 square feet. We measure the street before design.
- What the street can see. In a landmark or historic district, or on a designated historic property, a new ADU that isn’t a state-exempt unit can’t be visible from the public right-of-way, unless that rule would prevent the unit. Where a detached ADU in one of those districts can be seen from the street, it’s limited to 16 feet. We place the unit and check the sightlines on paper first.
- Power lines and poles. Pasadena Water and Power publishes minimum clearances from overhead power lines and poles for ADUs, and the City can hold a resubmittal until PWP signs off. We put the lines and the pole on the site plan before the layout is fixed.
- Recycling paperwork before the permit. Pasadena reviews the construction and demolition recycling requirements before it issues a permit and again before it closes one out. We set that up with the plan check submittal, not after.
- An ordinance rewritten after the State’s review. In February 2025, HCD found six problems in the City’s 2024 ADU ordinance, including limits on combining ADU types on one lot and parking rules for state-exempt units. The City amended Section 17.50.275 in 2026. We design to the current text, and to state law where the two differ.
Our Work in Pasadena
More than two dozen Pasadena projects are on record since 2017, most of them ADUs and garage conversions, with additions, a hillside submittal and a corner-lot variance among them. Pasadena asks for a package that agrees with itself: an indexed plan set, an ADU record whose address and site map match, Title 24 and HERS paperwork tied to the right permit, and a separate clearance from every department before plan release. Recent files include garage conversion ADUs carried from plan check to issued permits and closeout; an ADU held up until the address assignment and the site map agreed; a conversion where the natural-light and ventilation correction redrew the windows and skylights; and a 2020 variance submittal on a corner lot where RM-32 and RS-6 standards met. On the County side of the Pasadena postal area, a patio-enclosure addition waited on a Certificate of Compliance before the County would approve it.
Two Pasadena hearings, told in full: fitting a home and ADU on a Pasadena freeway remnant, and keeping a one-car garage while adding a basement ADU.
A pool house conversion with an ADU addition. Pasadena treats converted space and new floor area differently, so our drawings separated them: 232 square feet of the existing pool house converted, and 202 square feet added. In October 2024 the City held the resubmittal until Pasadena Water and Power approved the plans, after a site visit to confirm the clearances to the overhead lines and the utility pole. The City issued the permit in August 2025.
How review works in Pasadena
City Planning handles land use, Building and Safety handles plan check and the permit, and Design and Historic Preservation staff and the commission handle design and historic cases; lots outside the city limits go to Los Angeles County.
What comes up most: a complete, internally consistent ADU and site-plan package, and the separate departmental clearances that follow it.
Pasadena ADU rules, in plain terms
- Where the rules live: Pasadena Zoning Code Section 17.50.275, as amended by Ordinance No. 7464.
- How many: on a single-family lot, one converted ADU, one new ADU and one junior ADU.
- Size:
- new detached ADU: up to 1,200 square feet; 1,000 in a Hillside Overlay District; 800 on a hillside lot served by a street 26 feet wide or narrower;
- new attached ADU: up to 850 square feet with a studio or one bedroom, 1,000 with more than one bedroom; 800 on a hillside lot served by a street 26 feet wide or narrower;
- junior ADU: up to 500 square feet, inside the house.
- Height:
- new detached ADU: 18 feet and two stories;
- 16 feet in a Hillside Overlay District, in a landmark or historic district where it’s visible from the street, and for a state-exempt ADU in the front setback (18 feet near a major transit stop);
- new attached ADU: 25 feet and two stories, or the zone’s limit if lower.
- Setbacks: 4 feet from the side and rear lot lines for new construction. A state-exempt ADU of up to 800 square feet can sit in the front setback.
- Second-story windows (non-exempt junior ADUs): none along an interior side or rear lot line where the setback is less than 5 feet, unless the Building Code requires one for ingress or egress.
- Parking: one space for an ADU on a single-family site, and none on a multifamily site, with exemptions:
- within a half-mile walk of public transit;
- inside the existing or proposed walls of the house or an accessory structure;
- in a historic or landmark district;
- within one block of a car share stop;
- state-exempt ADUs.
No replacement parking when a garage is converted for an ADU.
- From January 1, 2027: state law (AB 956) requires Pasadena to approve two new detached ADUs of up to 800 square feet each, with 4-foot side and rear setbacks, on a lot with a single-family home. Where the City’s code allows fewer, state law controls. What changes in 2027
Pasadena questions
How big can an ADU be in Pasadena?
On most lots, a new detached ADU can be up to 1,200 square feet. In a Hillside Overlay District the limit is 1,000, and on a hillside lot served by a street 26 feet wide or narrower it’s 800. A new attached ADU can be 850 square feet with one bedroom or 1,000 with more.
Can I build an ADU in a Pasadena landmark district?
Yes. A new ADU there can’t be visible from the public right-of-way, unless that rule would prevent the unit, and a detached ADU that can be seen from the street is limited to 16 feet. We place the unit and check the views from the street before design.
Does Pasadena require parking for an ADU?
Often not. No space is required within a half-mile walk of public transit, in a historic or landmark district, for an ADU inside the house or an accessory structure, or for a state-exempt ADU. Converting a garage doesn’t require replacement parking.
Last reviewed: November 2026
Read the code
- Pasadena Zoning Code Section 17.50.275, Accessory Dwelling Units and Junior Accessory Dwelling Units
- HCD findings letter to Pasadena, February 26, 2025
- City of Pasadena, Accessory Dwelling Units page (with PWP’s ADU requirements and overhead clearance standards)
- California Government Code 66314 to 66342
Our Services in Pasadena
ADU Design
Detached ADUs, garage conversions, junior ADUs, and two-story units. Permit-ready plans prepared for Pasadena’s specific requirements.
Custom Home Design
Ground-up residential design from modern to traditional. Complete plan sets prepared for permitting.
Additions & Remodels
Room additions, second stories, kitchen and bath redesigns, whole-home renovations. Seamless integration with existing structures.
Plan Check Corrections
Plans stuck in review? We take over stalled projects, resolve code issues, and get permits approved.
Legalize Unpermitted Work
As-built documentation, code compliance analysis, and permit legalization for existing unpermitted additions and conversions.
Duplexes, Triplexes & Fourplexes
Duplexes, triplexes, and fourplexes, up to four units and two stories. Density analysis and code-compliant design.
Start Your Pasadena Project
Free consultation. We’ll review your project and the permit path, then quote a flat fee in writing. No pressure, no obligation.
